Author(s): Roger-Bruno Richard
As an industrial product normally comes out of the factory completely finished,the same is expected with buildings. Factory production (“pre� fabrication) isthe first degree of industrialisation. The next step is to apply the strategies &technologies of industrialisation to reach a large market. Then, quantity willjustify the investment in processes capable of simplifying the operations andeventually getting quality architecture available to the vast majority of people.But as buildings are site-related and industrialised technologies normallyfactory-related, the interaction with the site is still an important vector in thegeneration of an industrialised building system. Accordingly, three categoriesof Building Systems can be outlined: the site intensive Kit-of-Parts; the Factory-made Module and the Hybrid.In a sense, these three categories are like the basic three colours (i.e. blue/red/yellow) on the initial “palette� from which an artist can mix the proper huesfor his painting. Those three categories will generate 9 building systems types:from “A� to “I�. No one type or system is better than the others: there is noWorld Champion, only systems more relevant to their context.The four types of systems within the site intensive KIT-OF-PARTS (“Meccano�)category are distinguished by the geometry of the structural sub-system whichdetermines the jointing to do at the site which becomes the “final assemblyline�. Using dry mechanical joints, most of these components can be dismantledand reorganized into a modified or relocated building, thereby allowing forchange without demolition according to the sustainability agenda.In highly industrialized countries, FACTORY-MADE 3D MODULES are quiterelevant as they maximize factory production. Road transportation rules inNorth-America are permitting modules up to ± 4.5 m X 14m whereas theJapanese modules are limited to ± 2.5 m X ± 5.6 m X ± 2.8 m.The HYBRIDS are aiming at the best of both worlds. The Load-BearingService Core is concentrating the complex parts of a residential building insmall value-added modules and reducing the job-site activities to simpledry connections to generate large open “served� areas. With Site Mechanization,the site becomes ± a precast concrete structure factory whereasthe other sub-systems, being complex and compact, are better served byfactory-made components.
Volume Editors
John Quale, Rashida Ng & Ryan E. Smith
ISBN
978-0-935502-85-5